Transhipment

Transferring oil cargoes between vessels and terminals.

Transhipment lets a cargo change vessel on its way to market, to consolidate parcels, split a cargo, change to a vessel suited to the discharge port, or bring cargo into or out of storage.

We coordinate ship-to-ship (STS) transfers and terminal-based transhipment of crude oil and petroleum products, bringing together the vessels, transfer service providers, inspectors, and authorities needed for each operation.

Every transfer is planned around safety, cargo integrity, and accurate quantity measurement, with documentation that keeps the chain of custody clear from the mother vessel to the receiving vessel or tank.

Service Snapshot

Transfer Types
Ship-to-ship (STS) and via terminal
Cargoes
Crude oil and petroleum products
Typical Uses
Lightering, consolidation, splitting, relay to storage
Standards Referenced
OCIMF / ICS STS transfer guidance
Supporting Activities
Marine bunkering, petroleum bulk storage
Coordination Base
Singapore
Transhipment Options

Choosing the right transfer method.

Ship-to-Ship (STS)

Direct transfer between two vessels at an approved anchorage or transfer area, avoiding the need for a berth.

Terminal Transhipment

Cargo discharged into shore tanks and reloaded onto another vessel, useful where storage time or blending is needed.

Lightering

Partial discharge of a large vessel into smaller vessels so it can enter draft-restricted ports.

Cargo Consolidation

Combining parcels from several vessels into a single, larger shipment for long-haul voyages.

Cargo Splitting

Dividing a cargo across multiple vessels for delivery to different discharge ports or buyers.

Relay to Storage

Moving cargo from a vessel into bulk storage to await onward sale or shipment.

How It Works

Planning a safe transfer.

01

Assessment

Review the cargo, vessels, and location to confirm compatibility and feasibility.

02

Approvals

Coordinate port and authority permissions and vessel acceptance.

03

Transfer Plan

Agree mooring, equipment, transfer rates, and roles with all parties.

04

Inspection

Independent inspectors measure quantity and sample quality before transfer.

05

Transfer

Cargo is transferred under the agreed plan with continuous monitoring.

06

Close-Out

Final measurements taken and transfer documentation issued to all parties.

Safety First

Controls built into every operation.

Compatibility Checks

Vessel, equipment, and cargo compatibility confirmed before operations begin.

Weather Limits

Operations planned and paused according to agreed weather and sea-state limits.

Spill Prevention

Transfer procedures and equipment focused on preventing spills and pollution.

Recognised Guidance

Procedures referenced against OCIMF / ICS ship-to-ship transfer guidance.

Frequently Asked Questions

Common questions.

Common reasons include draft restrictions at the discharge port, consolidating smaller parcels into a larger shipment, splitting a cargo between buyers, or moving cargo into storage.

Only at approved anchorages or designated transfer areas, subject to the rules of the relevant port or coastal authority.

Independent inspectors measure the cargo before and after transfer on both vessels, and the results are recorded in the transfer documentation.

Supporting Activities

Bunkering and storage, built into the movement.

Our core logistics and transhipment work is supported by two sub-activities: marine bunkering to fuel the vessels we coordinate, and petroleum bulk storage to hold cargo between voyages. Both can be arranged within the same plan.

Supporting Activity

Marine Bunkering

Fuel supply for vessels within our logistics programmes and beyond.

Learn more →
Supporting Activity

Petroleum Bulk Storage

Tank capacity to stage, hold, or blend cargoes between voyages.

Learn more →
Core Service

Crude Oil Logistics

Seaborne movement of crude oil and petroleum products.

Learn more →

Discuss a transhipment

Share the cargo, vessels, and preferred location, and we will assess the options.